Advisors ReportsAdvisors Reports
  • News
  • Editorial
  • Feature
  • Special Report
  • Oil & Gas
    • Upstream
    • Midstream
    • Downstream
  • Power
    • Generation
    • Distribution
    • Transmission
  • Renewables
    • Solar
    • Nuclear
    • Hydrogen
  • Extractive Industry
  • Maritime
Search
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Band A supply milestone: IBEDC delivers 620 hours of electricity to customers since April
Share
Sign In
Notification Show More
Font ResizerAa
Advisors ReportsAdvisors Reports
Font ResizerAa
Search
  • News
  • Editorial
  • Feature
  • Special Report
  • Oil & Gas
    • Upstream
    • Midstream
    • Downstream
  • Power
    • Generation
    • Distribution
    • Transmission
  • Renewables
    • Solar
    • Nuclear
    • Hydrogen
  • Extractive Industry
  • Maritime
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
DistributionDocumentaryNewsPower

Band A supply milestone: IBEDC delivers 620 hours of electricity to customers since April

Admin
Last updated: June 20, 2024 6:09 pm
Admin
Share
2 Min Read
advisors reports - 1
SHARE

 

Oredola Adeola

 

The Ibadan Electricity Distribution Company (IBEDC) has announced that it has delivered a cumulative minimum of 620 hours of electricity supply to its customers via the 83 Band A feeders from April 2024 to date.

 

Engr. Francis Agoha, Acting Managing Director of IBEDC, confirmed this in a statement obtained by Advisors Reports on Thursday.

 

According to Agoha, the achievement was verified during a performance evaluation period monitored by the Nigerian Electricity Regulatory Commission (NERC).

 

The IBEDC initially started with 30 Band A feeders in April 2024. it subsequently received NERC approval to upgrade an additional 30 feeders later in April, followed by another 30 feeders in May, and an additional 15 feeders, totaling 83 feeders.

 

These Band A feeders, according to the DisCo are categorized into 34 – 11kV and 49 – 33kV feeders.

 

Agoha stated, “IBEDC remains committed to meeting the service delivery expectations of all our customers across various tariff bands.

 

“We continue to enhance our network upgrades within our coverage areas to ensure consistent and reliable electricity supply.

 

Additionally, we are working diligently to improve power supply to other bands significantly,” the Acting MD said.

 

IBEDC therefore commended its customers and NERC for their support in achieving this significant milestone.

 

The company reiterated its commitment to service excellence and continuous improvement, underscoring its mission to provide reliable and efficient electricity to its valued customers.

 

Recall that NERC approved a significant increase in the tariff for Band A customers, from around N66/kWh to N225/kWh, effective April 3, 2024.

 

That 240% increase, according to NERC, was due to rising costs, including a 59% increase in the exchange rate and a 63% rise in generation costs.

Electricity Act 2023: NERC hosts three-day retreat for HoR Power Committee 
Over 20 transmission towers vandalized between January 10-17, 2025
Relief to residents of Ajah-Lekki, as Adelabu commissions Siemens-PPI 132/33kv mobile substationed
Edo State becomes 6th state to gain authority for state-level electricity market oversight, effective August 21, 2024
 Adelabu, Minister of Power, threatens DisCos with license revocation for power distribution failures

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Copy Link Print
Share
Previous Article NNPC-TotalEnergies JV signs USD$550m FID on Ubeta gas condensate field dev’t project
Next Article SEforALL Board reappoints Damilola Ogunbiyi for a second 5-year term as CEO
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

- Advertisement -
Ad imageAd image

Latest News

Oil and gas technologies, including AI, too critical to rely on foreign languages- NLNG Deputy MD
Energy Transition Gas Impact Local Content Midstream News Oil & Gas Sustainability Technology
July 1, 2025
  Oilserve links AKK pipeline across River Niger, stays on track for Dec. 2025 completion
Gas Impact Local Content Midstream News Technology
July 1, 2025
Renaissance Africa Energy to unveil brand at NOG 2025
Advertorial Documentary Midstream News Oil & Gas Sustainability Upstream
June 30, 2025
Axxela hits 9 million man-hours without injury, surpasses 2023, 2024 records
Advertorial Local Content Midstream News Oil & Gas Sustainability
June 30, 2025
Follow US
© 2022 AdvisorsReports. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?