Advisors ReportsAdvisors Reports
  • News
  • Editorial
  • Feature
  • Special Report
  • Oil & Gas
    • Upstream
    • Midstream
    • Downstream
  • Power
    • Generation
    • Distribution
    • Transmission
  • Renewables
    • Solar
    • Nuclear
    • Hydrogen
  • Extractive Industry
  • Maritime
Search
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Abuja power outage: TCN blames low load allocation from GenCos
Share
Sign In
Notification Show More
Font ResizerAa
Advisors ReportsAdvisors Reports
Font ResizerAa
Search
  • News
  • Editorial
  • Feature
  • Special Report
  • Oil & Gas
    • Upstream
    • Midstream
    • Downstream
  • Power
    • Generation
    • Distribution
    • Transmission
  • Renewables
    • Solar
    • Nuclear
    • Hydrogen
  • Extractive Industry
  • Maritime
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
DistributionGenerationNewsPowerTransmission

Abuja power outage: TCN blames low load allocation from GenCos

Admin
Last updated: March 9, 2024 7:23 pm
Admin
Share
2 Min Read
Transmision line
SHARE

…disputes Gwagwalada tower vandalism as main cause 

 

Oredola Adeola

 

The Transmission Company of Nigeria (TCN) has debunked the notion that the current power challenges in Abuja and environs, stem from the Gwagwalada tower vandalism incident which happened on February 26, 2024, and therefore attributed the widespread power issues to low load allocation due to insufficient power generation across the national grid.

 

Ndidi Mbah, TCN General Manager, Public Affairs, made this known in a statement released on Friday and obtained by the Advisors Reports.

 

According to her, power is supplied to Abuja Electricity Distribution Company (AEDC) bulk power for Abuja and environs through three major 330kV transmission lines.

 

She added that the three bulk power sources are to ensure flexibility and reliability.

 

According to the statement, “Contrary to recent publication in the media, therefore, the Gwagwalada incident impacted the redundancy and flexibility of bulk supply and not the capability of TCN to supply adequate bulk supply to Abuja and environs.

 

 

“This simply means that the wheeling capacity of TCN to Abuja has not been affected because the available 2 x 33kV Shiroro-Ketampe Transmision lines are sufficient to convey allocated power to Abuja.

 

“It is important to note that the current power situation being experienced generally is a result of low load allocation, caused by the low power generation into the nation’s grid,” she stated.

 

As of the time this report was compiled on Saturday, Advisors Reports noted that AEDC had accessed 442MW out of the total 2,868MW distributed among all eleven DisCos, a result of the limited power generation feeding into the national grid.

 

 

 

UPDATED: MOJEC deploys over 300,000 prepaid meters across Nigeria in 2024 
NNPC denies petrol price hike, says cause of supply tightness resolved!
ExxonMobil unveils $1.5 bn investment to revive Usan deepwater field
Tinubu to clear N4 trn GenCos debt within six months — Adelabu
FG approves revival of Ikere Gorge Hydropower plant, construction of new substation for Oyo State

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Copy Link Print
Share
Previous Article  Ekpo foresees reduction in prices of cooking gas, CNG with disbursement of MDGIF
Next Article Simultaneous attacks on TCN infrastructure: Dan’agundi substation in flames, as vandals hit Shiroro-Katampe 330kV line 
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

- Advertisement -
Ad imageAd image

Latest News

Renaissance Africa Energy to unveil brand at NOG 2025
Advertorial Documentary Midstream News Oil & Gas Sustainability Upstream
June 30, 2025
Axxela hits 9 million man-hours without injury, surpasses 2023, 2024 records
Advertorial Local Content Midstream News Oil & Gas Sustainability
June 30, 2025
Float DisCos on stock market, end World Bank-loan guarantees for power sector – Damcida tells FG
Concession Distribution Documentary Energy Transition Finance Generation Green Finance Impact Interview News Power Solar Special Project Transmission
June 30, 2025
Tinubu appoints Buhari’s former SSA as Chairman of PCNGi
Downstream Gas Midstream News Upstream
June 27, 2025
Follow US
© 2022 AdvisorsReports. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?