Reading:  TCN denies responsibility for IBEDC’s unmet hours of supply for Band A feeders on April 9
Share
Sign In
Notification Show More
Font ResizerAa
Advisors ReportsAdvisors Reports
Font ResizerAa
Search
  • News
  • Editorial
  • Feature
  • Special Report
  • Oil & Gas
    • Upstream
    • Midstream
    • Downstream
  • Power
    • Generation
    • Distribution
    • Transmission
  • Renewables
    • Solar
    • Nuclear
    • Hydrogen
  • Extractive Industry
  • Maritime
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
DistributionNewsPowerTransmission

 TCN denies responsibility for IBEDC’s unmet hours of supply for Band A feeders on April 9

Admin
Last updated: April 12, 2024 10:10 am
Admin
Share
4 Min Read
SHARE

…  attributes actual cause to earth/over current faults on IBEDC feeders

 

Oredola Adeola

 

The Transmission Company of Nigeria (TCN) has blamed the Ibadan Electricity Distribution Company’s failure to meet its estimated power supply for Band A feeders on Tuesday, April 9, 2024, revealing that the actual reasons for the outage on the DisCo’s 11kV and 33kV feeders are earth/over current faults, which it claimed have no bearing on the transmission company’s frequency control operations.

 

Ndidi Mbah, TCN, General Manager, Public Affairs, made this known in a statement obtained by Advisors Reports on Thursday.

 

This statement is coming on the sideline of a statement released by IBEDC on Tuesday, April 9, 2024, attributing its failure to deliver the estimated 20 hours of supply to issues with its feeders.

 

The IBEDC had in the statement blamed TCN system outages and tripping on IBEDC feeders as the primary reasons for the unmet hours of service.

 

Meanwhile TCN has therefore refuted the allegations, claiming that after investigating the situation it was revealed that the IBEDC’s assertions were inaccurate.

 

TCN said, “That the feeders mentioned in the publication are NOT within the TCN network. This means that most of the listed feeders in the publication are 11kV operated by IBEDC and completely outside TCN’s Operational Control and in IBEDC’s network.

 

“That the reasons given for the outage on IBEDC 11kV and 33kV are earth/ over current faults, which have no bearing on TCN’s frequency control operations,” the statement claimed.

 

Mbah further stated that the claim by IBEDC was verified by TCN’s regional management in Osogbo in conjunction with IBEDC Officials themselves and has been proven to be false, necessitating necessary corrections being made.

 

According to her, the misinformation of IBEDC was a ploy to undermine and mislead the public against regular power supply.

 

She added that the company remained focused on supporting the government’s move towards a more robust and efficient power supply.

 

The TCN’s spokesperson has therefore assured the public of its commitment to continue to work hard to effectively transport the entire bulk electricity received from the generating companies to distribution load centres nationwide.

 

Specific areas affected by the power supply interruptions were:-

  1. Agba/Shoprite 11KV Feeder:
    • Duration: 10 hours
    • Cause: The feeder experienced a trip on an O/C fault
    • Impact: Power supply was affected on Station Road, Umaru Audi Road, Basin Road, FATE Road, Reservation Road, and Flower Garden
  2. Akeju 11KV Feeder:
    • Duration: 10 hours
    • Cause: The feeder tripped on an O/C fault
    • Impact: Power supply was disrupted on Tinumola-LAMECO Street
  3. Commercial 11KV Feeder:
    • Duration: 10 hours
    • Cause: A 33KV feeder tripped on an O/C fault
    • Impact: Power supply was interrupted on Pipeline Road, Awolowo Road, and Tanke Road
  4. Jebba Paper Mill 11KV Feeder and Jebba Paper Mill 11KV Feeder:
    • Duration: 8 hours respectively
    • Cause: A 33KV feeder tripped on an O/C fault
    • Impact: Power outage on Jebba Paper Mill 11KV Feeder affected Jebba Paper Mill Factory while the outage on Jebba Paper Mill 11KV Feeder affected Idi-Agbon, Station Road
  5. Osogbo GRA 11KV Feeder:
    • Duration: 8 hours
    • Cause: A 33KV feeder tripped on an O/C fault
    • Impact: Power supply was disrupted on Okefia-Old Garage Station Road
  6. Prime 11KV Feeder:
    • Impact: SawMill Alekuwodo was affected due to TCN Load Limitation
  7. Wonderful 11KV Tinumola 1 x 7.5MVA, 33/11KV ISS:
    • Duration: 10 hours
    • Cause: The 11KV feeder tripped on an O/C fault
    • Impact: Power supply was affected on Halleluyah Street

 

 

PETROAN bemoans Dangote refinery’s market monopoly, persistent price cuts
EKEDC inaugurates first 2x20MVA injection substation to address power rationing, outages in Surulere
AJERAP invites oil, gas leaders to exclusive one-on-one engagement with Julius Rone, GMD/CEO, UTM offshore Ltd on Oct. 2, 2024
NIPCO Gas, NNPCL commission Lekki gas distribution project with 100 MMSCFD capacity
Techno Oil, others bag BOI award for integrity

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Copy Link Print
Share
Previous Article Electricity tariff hike: Adelabu apologises for ‘Freezer/AC’ comments, says  “I didn’t mean to insult Nigerians 
Next Article More EKEDC customers to enjoy 20hrs of power supply, as NERC approves migration of 33 additional feeders to Band A
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

- Advertisement -
Ad imageAd image

Latest News

AMMON backs Tinubu’s ‘Nigeria First Policy’, says it will unlock Nation’s industrial potential
Distribution Local Content News Power Technology
May 19, 2025
11 Plc approves ₦3.34bn final dividend for FY 2024, declares 925 Kobo per share
Documentary Downstream Finance Gas Green Finance Impact Midstream News Oil & Gas Special Project
May 19, 2025
Federal High Court sentences 4 Chinese nationals to 20 years’ imprisonment for illegal mining in Plateau
Documentary Environment Extractive Industry Mining News Sabotage
May 16, 2025
FG approves revival of Ikere Gorge Hydropower plant, construction of new substation for Oyo State
Distribution Energy Transition Hydroplant News Power Renewables Transmission
May 15, 2025
Follow US
© 2022 AdvisorsReports. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?