Advisors ReportsAdvisors Reports
  • News
  • Editorial
  • Feature
  • Special Report
  • Oil & Gas
    • Upstream
    • Midstream
    • Downstream
  • Power
    • Generation
    • Distribution
    • Transmission
  • Renewables
    • Solar
    • Nuclear
    • Hydrogen
  • Extractive Industry
  • Maritime
Search

Archives

  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024

Categories

  • Advertorial
  • Concession
  • Distribution
  • Documentary
  • Downstream
  • Editorial
  • Energy Transition
  • Environment
  • Extractive Industry
  • Feature
  • Finance
  • Gas
  • Generation
  • Green Finance
  • Hospitality
  • Hydrogen
  • Hydroplant
  • Impact
  • Interview
  • Local Content
  • Maritime
  • Midstream
  • Mining
  • Mining & Solid Mineral
  • Multilateral Finance
  • News
  • Nuclear
  • Oil
  • Oil & Gas
  • Oil theft
  • Opinion-editorial
  • Photo News
  • Power
  • Renewables
  • Review
  • Sabotage
  • Security
  • Service Company
  • Solar
  • Special Project
  • Special Report
  • Sustainability
  • Technology
  • Transmission
  • Upstream
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Power outage hits Ile-Ife, Ikire, Ilesha, Ondo for 7 hours on Friday
Share
Sign In
Notification Show More
Font ResizerAa
Advisors ReportsAdvisors Reports
Font ResizerAa
Search
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
DistributionNewsPowerTransmission

Power outage hits Ile-Ife, Ikire, Ilesha, Ondo for 7 hours on Friday

admin
admin
Share
2 Min Read
SHARE

 

…as TCN fixes circuit breaker

 

Oredola Adeola

 

- Advertisement -
Ad image

Residents of Ile-Ife, Ikire, Ilesha, and some parts of Ondo State are expected to experience a seven-hour power outage on Friday, May 10, 2024, as the Transmission Company of Nigeria (TCN) has scheduled a planned replacement of a faulty circuit breaker protecting the Osogbo/Ilesha/Ife – Ondo 132kV transmission line.

 

Ndidi Mbah, General Manager, TCN Public Affairs, made this known in statement on Thursday, obtained by Advisors Reports.

 

According to the statement, TCN’s maintenance crew will replace a faulty Circuit Breaker protecting Osogbo/Ilesha/Ife – Ondo 132kV transmission line with a new one on Friday between 10am and 5pm.

 

This, according to her, will affect bulk power supply to Ile-Ife, Ilesha and Ondo Transmission Substations, which receives power through the Osogbo/Ilesha/Ife – Ondo 132kV transmission line.

 

TCN said, “Consequently, Ibadan and Benin DisCos will not be able to offtake power for seven (7) hours through the Ife township, Ikire/Wasinmi, OAU, Ife Iron & Steel, Sekona, Efon alaaye, IBL, Ilesha township, Ibokun/Idominasi, Ipetu-Ijesha and Ijebu-Ijesha feeders to its customers in the listed areas.

 

Mbah in the statement to electricity consumers in the affected areas, assured that power supply will be restored after the exercise is completed.

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Copy Link Print
Share
Previous Article EKEDC to reopen metering portal, mandates MAP vendors to stock minimum of 2,000 prepaid meters
Next Article Nasarawa lithium factory offers Nigeria chance to master processing skills – President Tinubu
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Recent Posts

  • NNPC/Seplat JV commissions  power system/underground cabling project at NOGAPS Odukpani
  •  $50bn refinery equity structure: Ondo govt. says 1,300ha land-for-20% stake deal misrepresented by critics, reserves 5% for Ilaje Communities
  • NUPRC approves $20bn worth of FDPs between Jan-Nov 2025 – Engr. Komolafe tells NAEC
  • Engr. Ramat, future of NERC: Separating fact from fiction
  •  Realty Point accuses Ogun officials, Amotekun of trespass, defiance of Court orders at Pakuro Scheme 1

Recent Comments

No comments to show.
Follow US
© 2022 AdvisorsReports. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?