Advisors ReportsAdvisors Reports
  • News
  • Editorial
  • Feature
  • Special Report
  • Oil & Gas
    • Upstream
    • Midstream
    • Downstream
  • Power
    • Generation
    • Distribution
    • Transmission
  • Renewables
    • Solar
    • Nuclear
    • Hydrogen
  • Extractive Industry
  • Maritime
Search
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Ogun Free-Trade Zone Hoax: Zhongshan, Chinese firm’s attempt to strip 3 Nigeria’s Presidential jets, other assets in foreign jurisdictions
Share
Sign In
Notification Show More
Font ResizerAa
Advisors ReportsAdvisors Reports
Font ResizerAa
Search
  • News
  • Editorial
  • Feature
  • Special Report
  • Oil & Gas
    • Upstream
    • Midstream
    • Downstream
  • Power
    • Generation
    • Distribution
    • Transmission
  • Renewables
    • Solar
    • Nuclear
    • Hydrogen
  • Extractive Industry
  • Maritime
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
DocumentaryNewsSabotage

Ogun Free-Trade Zone Hoax: Zhongshan, Chinese firm’s attempt to strip 3 Nigeria’s Presidential jets, other assets in foreign jurisdictions

Admin
Last updated: August 16, 2024 2:14 am
Admin
Share
7 Min Read
SHARE

… as FG vows to discharge controversial orders by Paris Court in March, August 2024

 

Oredola Adeola

A 2007 contract between Ogun State and Zhongshan Fucheng Industrial Investment Co. Ltd., intended to manage a free-trade zone, has unraveled into a major international controversy, with the Chinese company now embroiled in accusations of attempting to strip Nigeria of its assets abroad, including thee 3 presidential jets of the Nigerian Government as “security” for its claim.

This was contained in statement released by the Presidency on Thursday on the sideline of the arm-twisting tactic by the Chinese company to attach Nigerian government-owned assets in foreign jurisdictions.

Advisors Reports’ check showed that the Ogun State in 2007 under the administration of former Governor Gbenga Daniel signed the contract with Zhongshan Fucheng Industrial Investment Co. Limited for the development and management of a free trade zone in the state.

The dispute began when the contract, designed to promote economic development through the creation of a free-trade zone in Ogun State, fell apart in 2015.

The statement from the Presidency established that the material facts in the transaction between the Ogun State Government and Zhongshan point to another P&ID case in which it alleged that unscrupulous and questionable individuals falsely present themselves as investors with the sole objective of undercutting and scamming governments in Africa.

The FG said, ” Zhongshan, undoubtedly, withheld vital information and misled the Judicial Court in Paris into attaching the Nigerian government’s presidential jets, which are on routine maintenance in France.

“The use and nature of the presidential jets as assets of a Sovereign entity whose assets are protected by diplomatic immunity forbid any foreign court from issuing an order against them,” it said.

The Government further revealed that it was convinced that the Chinese company misled the Judicial Court of Paris regarding the use and nature of the assets it seeks to attach and did not fully disclose to the court as required by law.

The Presidency said, “This same Chinese company had tried to enforce its questionable judgment in the UK and USA but failed.

“Like the P&ID case, foreign companies are trying to defraud Nigeria with the collaboration of some bureaucrats. Zhongshan appeared to have sold the judgment they got to a venture capitalist seeking to make money by embarrassing the Federal Government and President Bola Tinubu.

The government has therefore assured Nigerians that it is working with the Ogun State Government to discharge what it described as a frivolous order in Paris promptly.

The Presidency has further emphasised that it will always work to protect our national assets from predators and shylocks who masquerade as investors.

Background to the Zhongshan Fucheng Case:

A contract between Ogun State and Zhongshan to manage a free-trade zone was executed in 2007. The parties entered into a dispute in 2015, and arbitration began in 2016.

By 2019, the arbitration hearing had been concluded. The Arbitral Panel awarded over 60 million USD against the Federal Government of Nigeria (FGN), a co-defendant, when all Zhongshan had done was build a perimeter fence around the free-trade zone.

Based on legal advice, the Ogun State Government resolved to resist the enforcement of the award.

The resistance was successful in 8 different jurisdictions. There are pending appeals against recognition orders issued in both the US and UK.

Ogun State also engaged Zhongshan in settlement discussions on reasonable terms. The last meeting, held in September 2023 in London, lasted for three days and was attended by several officials of Ogun State, including Governor Dapo Abiodun and the Attorney General/Minister of Justice, Prince Lateef Fagbemi.

Zhongshan’s initial reasonable readiness to consider Ogun State’s offer was surprisingly reversed by the second day when it insisted on the government paying the full arbitration debt. This led to a breakdown of the mediation, with parties agreeing to meet again in the first quarter of this year.

The Presidency is aware of the various failed attempts by a Chinese company, Zhongshan Fucheng Industrial Investment Co. Limited, to take over offshore assets of the Federal Government of Nigeria through subterfuge.

The Federal Government is not under any contractual obligation with the company. The case in which Zhongshan tries to use every unorthodox means to strip our offshore assets is between the company and the Ogun State Government.

The Federal Government is fully aware of efforts being made by the Ogun State Government to reach an amicable resolution on the matter.

It must be said without any equivocation that Zhongshan has no solid ground to demand restitution from the Ogun State Government based on the facts regarding the 2007 contract between the company and the State Government to manage a free-trade zone.

When the contract with Ogun State was revoked in 2015, the company had only erected a perimeter fence on the land earmarked for a free-trade zone.

While the Attorney-General of the Federation and Minister of Justice is working with the Ogun State Government on an amicable resolution, Zhongshan obtained two orders from the Judicial Court of Paris dated March 7, 2024, and August 12, 2024, without any notice being duly served on the Federal Government of Nigeria and Ogun State Government.

This arm-twisting tactic by the Chinese company is the latest in a long list of failed moves to attach Nigerian government-owned assets in foreign jurisdictions.

Mainstream Energy restores Sabon Pegi bridge within 24 hours after collapse due to heavy rainfall
OTC 2024: Nigeria, others to discuss regional investment opportunities, collaboration
Transcorp Power Plc makes NGX debut with 7.5bn shares listed at N240 per share, valuation surges to N1.98 trn
Full privatization of Port Harcourt, Kaduna, Warri refineries underway – Presidency
Aliko Dangote unveils first sample of petrol as Dangote refinery begins petrol production

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Copy Link Print
Share
Previous Article Tinubu reactivates Gulf of Guinea gas pipeline agreement
Next Article WIEN, Smart Gas Ltd. set to distribute 100,000 3kg, 6kg cylinders annually, targets 500,000 homes nationwide
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

- Advertisement -
Ad imageAd image

Latest News

#OTC2025: PETAN honours Chevron’s Jim Swartz, Engr.Komolafe, Aradel holdings, others in Houston
Energy Transition Local Content News Oil & Gas Service Company Special Report Sustainability
May 7, 2025
TCN completes repair of Ikeja-West/Osogbo 330kV line after 32 days
Distribution News Transmission
May 7, 2025
Ageing workforce: Adelabu approves training of 1,200 electrical engineers over next 10 years
Distribution Energy Transition Generation News Power Renewables Sustainability Transmission
May 7, 2025
ExxonMobil unveils $1.5 bn investment to revive Usan deepwater field
Energy Transition News Oil & Gas Sustainability Upstream
May 7, 2025
Follow US
© 2022 AdvisorsReports. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?