Advisors ReportsAdvisors Reports
  • News
  • Editorial
  • Feature
  • Special Report
  • Oil & Gas
    • Upstream
    • Midstream
    • Downstream
  • Power
    • Generation
    • Distribution
    • Transmission
  • Renewables
    • Solar
    • Nuclear
    • Hydrogen
  • Extractive Industry
  • Maritime
Search
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Ikeja Electric to suspend 2-yr-old Bilateral Power Agreement with Magodo GRA Phase 2 from July 15, 2024
Share
Sign In
Notification Show More
Font ResizerAa
Advisors ReportsAdvisors Reports
Font ResizerAa
Search
  • News
  • Editorial
  • Feature
  • Special Report
  • Oil & Gas
    • Upstream
    • Midstream
    • Downstream
  • Power
    • Generation
    • Distribution
    • Transmission
  • Renewables
    • Solar
    • Nuclear
    • Hydrogen
  • Extractive Industry
  • Maritime
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
News

Ikeja Electric to suspend 2-yr-old Bilateral Power Agreement with Magodo GRA Phase 2 from July 15, 2024

Admin
Last updated: July 2, 2024 12:24 pm
Admin
Share
2 Min Read
SHARE

“Magodo GRA Phase 2 residents have been enjoying N72.40/kWh electricity tariff rates” -Source

Oredola Adeola

The Ikeja Electric (IE) has notified the Magodo Resident Association (Magodo GRA Phase 2) of its intention to suspend the existing Bilateral Power Purchase Agreement (PPA) effective from July 15, 2024, after nearly two years of operation.

Folake Soetan, CEO of Ikeja Electric, communicated this decision in document IE/REG/CUS/24/01, dated July 2024 and obtained by Advisors Reports on Monday.

Advisors Reports gathered that the PPA, which commenced on September 15, 2022, is being suspended due to significant developments in the electricity market and regulatory framework.

Key factors influencing this decision according to the IE CEO include the January 2024 Multi-Year Tariff Order (MYTO), subsequent Supplementary MYTO Orders from April 2024, and challenges related to non-cost reflective pricing for Ikeja Electric’s bespoke bilateral services.

Soetan further emphasized that these changes necessitate a review of the sustainability of Ikeja Electric’s bilateral services under the PPA.

She said, “This will enable Ikeja Electric to review the sustainability of its bilateral services and further engage the Estate and or its representatives on the modalities for continued bilateral services.”

Despite the suspension, Ikeja Electric reassured the Estate of its ongoing commitment to ensuring a reliable and sustainable power supply for its members.

Advisors Reports have learned that despite the recent tariff increase for Band A feeders by the Nigerian Electricity Regulatory Commission (NERC), residents of Magodo GRA Phase 2 continue to benefit from uninterrupted power supply at a discounted rate through their Bilateral Power Purchase Agreement (PPA) with Ikeja Electric.

Initiated in September 2022 at a rate of N50 per kilowatt hour, the PPA has since been adjusted upwards to N72.40/kWh, providing Magodo residents with a minimum of 20 hours of electricity daily.

The Advisors Report confirmed that this rate stands in stark contrast to the new Band A tariff of N206/kWh introduced by NERC in its 2024 Supplementary Order.

NNPCL cuts petrol ex-depot price from ₦1,020 to ₦899, sparks price war among oil marketers
Dangote Refinery partners with MRS to sell petrol at ₦935/L, nationwide
UEF SEForAll grantee connects 140 businesses to stand-alone solar in Ayangburen Market, Lagos
NAEC 2024 International Energy Conference set for October 3 in Lagos
Nigeria LNG unveils new logo, reaffirms commitment to sustainable future

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Copy Link Print
Share
Previous Article NCDMB implements Tinubu’s directive: Unveils 5 measures for content compliance in oil,gas Industry
Next Article PETAN deploys ‘Quality Seal’ to differentiate genuine service providers from ‘Portfolio-Carrying Companies’
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

- Advertisement -
Ad imageAd image

Latest News

Federal High Court sentences 4 Chinese nationals to 20 years’ imprisonment for illegal mining in Plateau
Documentary Environment Extractive Industry Mining News Sabotage
May 16, 2025
FG approves revival of Ikere Gorge Hydropower plant, construction of new substation for Oyo State
Distribution Energy Transition Hydroplant News Power Renewables Transmission
May 15, 2025
Nigeria 27th crude oil grade, Obodo medium sweet crude blend enters global market
Local Content News Upstream
May 13, 2025
FG to take over two underperforming DisCos between May, August 2025 
Distribution Generation Impact News Power
May 13, 2025
Follow US
© 2022 AdvisorsReports. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?